The product "MEINL HE-111 DARBUKA HE-111 ALUMINUM HAND-HAMMERED" is in the cart.
MEINL HE-111 DARBUKA HE-111 ALUMINUM HAND-HAMMERED

MEINL HE-111 DARBUKA HE-111 ALUMINUM HAND-HAMMERED

Product Code: HE-111...........

DARBUKA MEINL HE-111 DARBUKA HE-111 ALUMINUM HAND-HAMMERED

$65.49
  • Price Range: 50,00 - 99,99$
  • Quantity Available: 0
  • Availability: Usually ships within 2 to 5 weeks if in stock at the supplier.

ALUMINUM DARBUKA, HAND HAMMERED


MEINL Percussion Darbukas are made in the tradition of the original, esoteric goblet-shaped drums found in music from Eastern Europe, the Middle East and Southern Asia. Our darbukas are constructed from thin shells in various metals, each metal giving the different models their special timbre. The head is secured and tuned with external rings set close to the shell, in the Turkish-Style. Light yet powerful, the darbukas have a deep full bass. They are well suited for high-pitched snapping sounds as well as a wide range of articulated "doum" and "tak" strokes.

Features:

  • Synthetic head
  • Hand-hammered shells
  • Tunable

Your Browsing History

DIGIFLEX PEDAL-PACK
  • $13.49
  • Retail price $15.49
MARKBASS LITTLEMARK VINTAGE 1000
  • $1,399.99
  • Retail price $1,749.99
YAMAHA FG800 FOLK GUITAR SAND BURST
  • $299.99
  • Retail price $359.99
You May Also Be Interested In
The product "MEINL TMT1B-BK HAND BRASS JINGLES BLACK" is in the cart.
MEINL TMT1B-BK HAND BRASS JINGLES BLACK
  • $86.99
  • Quantity Available: 0
  • Availability: Usually ships within 2 to 5 weeks if in stock at the supplier.
The product "MEINL HTMT2BK MOUNTED TAMBOURINE STAINLESS STEEL JINGLES BLACK" is in the cart.
MEINL HTMT2BK MOUNTED TAMBOURINE STAINLESS STEEL JINGLES BLACK
  • $50.99
  • Quantity Available: 0
  • Availability: Usually ships within 2 to 5 weeks if in stock at the supplier.
The product "MEINL STB80B 8 BIG MOUTH 8 HAND BRUSHED STEEL" is in the cart.
MEINL STB80B 8 BIG MOUTH 8 HAND BRUSHED STEEL
  • $72.49
  • Quantity Available: 0
  • Availability: Usually ships within 2 to 5 weeks if in stock at the supplier.